Project Description
With the complexities in handling heavy Uranium Tailings, with the assistance of Paterson & Cooke consulting engineers, the pivot walkway is being used to deposit the tailing in an arc pattern along the length of the walkway. This ensures the tailings ia deposited evenly over the area of the tailings pond.
With additional walkway sections installed as required, to date the client has acquired over 102m of flexible walkways located at different points around the pond. Delivered Fully Assembled via truck from and transshipped to local carriers for Ice Road journey through the territories.
Download PDF of this project click here