Project Description
This Gold mine project located in the mountains at the east end of Turkey was delivered via sea freight to the Black Sea port of Trabzon and hauled up the mountains to this underground mine operation. The client chose a RTA (ready to assemble) option and built the walkway as required on 2 tailings ponds.