Project Description
The walkway was designed and built to unload the diamond bearing gravel from the diamond diver boats that operate along the coast of Namibia. At the end of the walkway there is a 6m x 6m platforms with a water pump and hopper system which carries the deposited gravel back to the plant for separation and grading.